The challenge
The new structured cabling needed physical pathways that would be orderly and easy to maintain. Running cables without a defined route would make later changes and extensions more difficult.
Technical considerations
The work called for a practical combination of cable trays and galvanized conduit, selected to suit the routing requirements of the installation.
What N+3 delivered
N+3 installed approximately 30 m of cable trays and 20 m of galvanized conduit, preparing the physical infrastructure for the structured cabling deployment.
The outcome
The network cabling could then follow defined routes, with a more maintainable foundation for future changes and extensions.