The challenge
The industrial operation needed additional network outlets and a larger LAN footprint without losing the organization of its physical cabling.
Technical considerations
Serving 41 workstations in a production environment required planned routes and a substantial cable installation rather than isolated connections.
What N+3 delivered
N+3 expanded the 1 Gb/s LAN with 41 networked workstations and approximately 800 m of structured cabling, integrated into the distribution infrastructure prepared for the expansion.
The outcome
The facility gained the planned 41 network points on an organized LAN, with 1 Gb/s connectivity and a clearer physical foundation for future work.