The challenge
The hotel needed an electrical supply for heaters, requiring new cable routes, dedicated-use outlets and changes to an existing distribution panel.
Technical considerations
The work had to address the whole supply path: conduit, circuits to the dedicated outlets and the corresponding panel modification.
What N+3 delivered
N+3 installed electrical conduit, ran the wiring for dedicated-use outlets and modified the distribution panel to incorporate the new supply.
The outcome
The infrastructure was prepared to serve the electric heaters through defined routes, dedicated outlets and an updated distribution-panel connection.